CN235/295 electrical system

 

 

Industrialisation of the functional voltage tests:

¬ Check the correct installation of the wiring of the equipment used to feed the bars

¬ Carry out the functional tests for the power supply equipment

¬ Checking the wiring of the different bars and the distribution of the current across them

¬ Carry out the different functional tests

aerospace-sistemas-prueba-grayicon
Systems engineering [+]

On-board system testing > Aviation system engineering

Date: 2003 – present

Client: EADS CASA

 

 

Share Button